Choosing the right spot for the filtration system near the water meter
Getting Ready
Working organised & clean is essential for any further step
Positioning & Leveling
After positioning and levelling, the filter system stand is concreted in place, it takes about 5 min the concrete to set
Preparing Trench
We dig a trench only as much as we need to prepare the cut-in to the main cold water supply
Looping Into The Mains
After looping into the main water service, we check all connections for water leaks, bleed the air out of the system and backfill the trench
Mounting The Cover
The powder coated aluminium casing protects the filter system from the weather. The casing is fully ventilated to ensure no hot air is trapped inside
Convenient Tap
A convenient tap is hidden at the back of the filter casing (special order only)
The Back
A garden hose can now be connected to the tap using a standard size garden hose adapter
Hand Over
After cleaning up we proudly hand over another beautiful whole house filtration system, and leave our client with a fantastic new clean water experience